Monday, June 8, 2015

Life after your First Agile Project

This blog post is adapted from a workshop/presentation I recently led at the May NWA PMI Professional Development Day.​



So, you just finished your first Agile project in a Waterfall organization. Now what? Let me put my Agile Coach hat on and tell you, “It depends.” It depends on whether or not it was a positive experience and how supportive the overall organization is of this “Agile thing”. Let’s run through a few possible scenarios.

Agile Sucks



You may be one of the many people whose first exposure to Agile is a negative one. Maybe your team was uncooperative. Maybe there were too many practices that were too new for the team to successfully adopt. Maybe the organization was so un-Agile that your team got exhausted from trying to swim upstream the whole time. Or maybe your team never really became an Agile team; you were a bunch of silo’d individual contributors with Waterfall mindsets trying a new front-end to the same process you’ve always used to get the job done. Whatever the reason, all you know for sure is that Agile sucks. It simply does not work; not for you, maybe not for anyone.

As an Agile Coach, I am sincerely bummed if this was your experience. I wish I could have been there to help make sure you knew why you were adopting Agile, not just how to go through the motions. I wish I could have been your heat shield, to protect you from the Agile defeatists and remove organizational impediments for you. I wish I could have helped you through the forming and storming stages of a team into norming and performing, so that you could benefit from a team who, corny as it sounds, was greater than the sum of its parts. I wish I could have helped you learn how to continuously improve not all at once, but incrementally.

But I wasn’t there, so what will you do? I hope that you will take pause and consider the possibility that those Agile proponents can’t all be crazy. What did they do or have that you didn’t? What might you have missed? Get involved in virtual and physical Agile communities, remain open-minded, and stuff your toolbox with as many practices and approaches as you can. Study the Agile Manifesto and its principles and recognize that what it’s defining is a mindset, not a methodology. You have to be Agile before you can successfully do Agile.

Agile Recipe



Maybe you had some success with Agile – or at least you think you did – and you want to keep doing it with all your future project teams. What really happened is you ran a successful Scrum project, and you’re ecstatic that you found a working recipe that will turn any team into a high-performing team. The team followed the Scrum Guide to the letter and there’s no doubt in your mind that this is what Agile is all about. Agile is Scrum, Scrum is Agile. If you follow the exact same approach, you are confident you will have similar results with your next team. After all, this is the same company, same culture, same organization support and/or impediments. Why shouldn’t you expect the same results?

The short answer is because it’s not the same team. Even if some of the people are the same, if the make-up of the team isn’t exactly the same then it’s a different team. You’ll be starting back at the forming stage with a new backlog, maybe even a new Product Owner, and there’s no guarantee that this group of people will interpret and embrace the Scrum Guide the same way the old team did. Hopefully you learned enough about teaching, coaching, and/or facilitation from your last team that you can guide this new team through the same pitfalls in a faster, safer way. Hopefully you learned Servant Leadership skills that will help you get buy-in from the team to try this new thing. Hopefully.

Hopefully you learn by the end of this project how much more successful the project would have been if you would have kept your previous team together. There is a cost associated with breaking up a high-performing team and knocking everyone back to the forming stage. There are also reasons that you may want to incur that cost in order to reap specific benefits, but “because the project ended” is not one of those reasons.

Keep the Scrum Team



Not only did you have success with the team, the team became a family. You are now a high-performing Scrum team that knows the process and each other so well that you couldn’t dream of breaking them up. You manage to keep the team together for the next project, and you hit the ground running.

This is great, but you have to be careful. If you have decided that Scrum is the be-all end-all of Agile then, eventually, the team will begin to stagnate. Scrum ceremonies will become ritualistic instead of productive, thought-provoking team activities. Group-think may begin to crop up, and the electric feeling of respectful debate will flicker out of the team. Some team members may become too comfortable, others restless. If you don’t do something, you’ll lose everything you fought to keep.

My hope is that you learn that Agile isn’t about following a recipe. It’s about starting with a recipe and making it your own. It’s about evolving the way you cook, trying new flavors, and learning how to transition from cook to chef. Hopefully you find all the success you were looking for and more, because our successes motivate us to keep going, keep trying.

Become comfortable with mining for conflict and facilitating conflict to unearth change that will make the team better. Stay in tune with the latest ideas and do your best to keep the team in the “Learning Zone”.

Grow the Agile Team

credit: universal studios

Perhaps you’re one of the rare few who, by the end of your first Agile project, recognize already that the team should be together and should not be limited to just Scrum. Perhaps you’ve already begun incorporating aspects of Lean, Kanban, DevOps, Lean Startup, Lean Enterprise, eXtreme Programming, or any number of other Agile approaches to help your team stretch and grow. You have a vision for how amazing your team can be – a unicorn among horses – and you recognize that Agility is a journey, not a destination.

The team can only become so awesome before running into major roadblocks within the organization. The team can become locally optimized, but the benefits will be limited until the entire system is optimized. After all, this is a Waterfall organization – you can run whatever methodology you like within your team, but there’s still an overall process that must be respected.

You’ll soon find that, in order to best help the team, you have to spend less time with the team and more time fixing the environment they live in. Maybe it’s the dependent teams – adjacent teams doing similar work or component teams, such as Security, Infrastructure, or Release teams. Maybe the Operations team is pushing back, trying to drive constancy at the sake of functionality. Maybe it’s the way work is approved and projects are formed that prohibit the team from responding to customer requests and market demands as quickly as they are capable. Maybe there are leaders or others in the organization that are afraid of change and, consequently, are passively or actively sabotaging the spread of Agile.

If you are successful, you will find that organizational Agility provides orders of magnitude greater than a single Agile team. You’ll find that what the team does rarely have as great an impact on their performance as the environment in which they operate.

Tuesday, October 7, 2014

Agile vs. non-Agile Value Delivery

One of the key differences between Agile and non-Agile approaches is how scope is managed. Agile techniques use some form of continuous backlog management, while non-Agile approaches set the scope up-front and changes to that scope are painful. As a result, I'm often asked how this impacts budgeting. I respond that I prefer a budgeting approach that aligns with "Beyond Budgeting" thinking, but I recognize that such a shift likely won't occur at the same time the team wants to start using Agile. I advise them to secure budget the same way they have been (due primarily to lack of choice), but use the money in a more Agile way. Here are three scenarios that illustrate why.

The Perfect Planning Scenario

First, let's look at what happens if both Agile and non-Agile approaches were to deliver exactly the same value implemented exactly the same way and we knew up-front exactly how much it would cost. If we took an iterative delivery approach then we would see an "S-curve" in the delivery of value (in blue), as explained in the video "Agile Product Ownership in a Nutshell" by Henrik Kniberg (starting at the 8:27mark). This allows us to capitalize on what we're building faster, so we start making or saving money faster. Compare this with the non-Agile approach (in red), where we don't see any value until the end. The area between the blue line and the red line is additional realized value over time, even though we ended up in the exact same place at the exact same time.

Blue = Agile; Red = non-Agile

The Bad Estimate / Budget Cut Scenario

Now let's imagine (if you can) a scenario where we don't have sufficient time to deliver all of the value. Maybe it's because our estimates are off. Maybe because it's because our budget is cut. Whatever the case, we end up with 60% of the time and money necessary to deliver all of the planned value. If we take an Agile approach, we end up with the top 60% of the functionality, 100% completed. If we take a non-Agile approach, we end up with 100% of the functionality 60% completed. This means that we're either delivering nothing but documentation and partially-coded functionality, or we end up begging for the money required to finish delivering what we started out to deliver.

Blue=Agile; Red=non-Agile

The Imperfect Human Scenario

This scenario was difficult to name - I'm open to alternatives. Basically, this is the scenario where the humans responsible for doing all of the non-Agile prep work of requirements elicitation, design, and coding end up delivering something that not only took longer than anticipated but didn't provide the desired value. By taking an Agile approach, we do "Just Enough, Just in Time" everything, so we're always as smart as possible when we make decisions. We work in short iterations and get fast feedback so that our defects are cheaper and our direction is constantly being corrected. As a result, we end up delivering more value sooner.

Blue=Agile; Red=non-Agile

Making a Point

As per usual, my drawings are overly-simplified to make a point. Agile is not a silver bullet, but taking an Agile approach means you're more likely to deliver more value sooner and end up with a better end-product. Hopefully this approach propagates throughout the entire organization and the way you manage work-intake, scope approval, and value execution become leaner and more continuous from end-to-end. In the meantime, do what you can within the reality of the world you live in to make the most of the resources you have. I'd love to hear your perspectives and additional scenarios that illustrate the differences in Value over Time between Agile and non-Agile approaches.

Friday, January 24, 2014

A(nother) Response to SAFe Criticisms: Part 3

Full Disclosure: I am a certified Scaled Agile Framework (SAFe) Program Consultant (SPC).

In the first part of this series, I explained my intent behind answering some of the criticism for SAFe and asked for concerns that you would like to see addressed. I haven’t received any direct feedback, but the offer still stands. In the meantime, I’m going to dive into some of the more common criticisms I’ve seen already published. I’ll try to focus on one concern or small group of related concerns per blog post.

HIP Sprints
One criticism that’s prevalent among SAFe’s detractors is the inclusion of the HIP Sprint on the Big Picture. This is another case of SAFe trying to accommodate reality for organizations new to Agile. HIP, by the way, stands for “Hardening | Innovation | Planning”. It definitely gives the vibe of “Waterfalling the Sprints” and deserves our attention.

Hardening
Hardening should, in my honest opinion, be done away with as soon as humanly possible. However, if you’re brand new to Agile and have not yet built up your technical practices and hardware, releasing to Production without a hardening period is a bad idea.

SAFe does a good job of outlining what may be appropriate hardening activities versus those that could/should be done sooner. This is a good resource for new teams to get rid of hardening. Teams should focus first on getting activities that should definitely be done before hardening included in their Sprint Definition of Done. Then they move on to those that could be done sooner out of hardening. Eventually, they should aim to have their Release Definition of Done match their Sprint Definition of Done. At this point they could, potentially, go to Production with the completion of each User Story, which is just a hop, skip, and a jump away from a continuous delivery team.

Innovation
I know, I know, having an “Innovation Sprint” is like having a “Kaizen event”. And yet, we hold Retrospectives as an opportunity to focus on improvement that should, in theory, be continuous. If your company does not support a culture of innovation then no framework will magically change that. However, if you have a team that has managed to eliminate hardening activities, they should be rewarded with a Sprint of unfettered innovation. Give them a couple of weeks to do what they want and they will surprise you with how much they accomplish! Heck, it may even help to transform the company’s culture to one that embraces innovation.

Planning
This aspect of “HIP” tends to have the least resistance as Planning is well-recognized as a fundamental component of successful Agile organizations. The final Sprint of the PSI should include the planning activities that will prepare the Agile Release Train for the upcoming PSI. These include the Solution Demo (PSI Review), Inspect & Adapt Workshop (PSI Retrospective), and PSI Planning (PSI Planning).

Most ARTs will get these activities done in the last 2-3 days of the PSI. The timing and duration are flexible, but the activities are essential, especially for new Agile teams. This may not make sense for continuous delivery teams, but neither do any of the other time-boxed meetings that provide the structure for time-based commitment approaches (a la Scrum).

Thoughts?
Given my experience with new Agile teams, the HIP Sprint is a powerful tool. Without it, making the transition to Agile would be near-impossible. Is it a mature Agile practice? No, of course not. But is it better than continuing with Waterfall until the teams magically reach a state where they can do Agile without a HIP Sprint? Most definitely. That’s what I think, anyway.

Thursday, January 23, 2014

Asking Kaizen Questions

If you've read my previous material you already know that I'm a big proponent of questioning everything - getting to the "Why?" of what we do. What I've realized lately is that simply asking "Why?", though a good start, is not as effective as asking the right "Why?".

We get better by asking questions and acting on the answers. The better the questions, the better the answers. I'm going to refer to the right kind of "Why?" question as Kaizen questions (full disclosure: I don't know if this is already a thing or not, but a basic Google search tells me it's at least not widely used).

Let me give you an example. One question I get a lot from those resistant to Agile is, "Why should I give up Waterfall?" or "Waterfall's always worked for me; why should I stop?" A slightly more open-minded derivative to this question is, "Why should I try Agile?" If we were to take the Kaizen approach and recognize that perfection is unattainable but improvement is always possible, we would ask, "Why should I continue using Waterfall?" or "What other approaches could I use to deliver quality and value to my customers?"

The Kaizen Question doesn't ask how well the current approach is working because there is an inherent understanding that it could be better. It focuses only on the alternatives to what is currently being done. This type of question is crucial for those adopting Agile to ask themselves as they transition. Otherwise, they risk simply moving from a poor status quo to a better status quo.

If you move to Scrum because you asked yourself, "Why should I try Scrum?" then you are more likely to stick with Scrum and never try something new than if you'd started your journey by asking, "Why should I stick with what I'm currently using?" Do you see the distinction?

I would hope that those who try Scrum eventually adopt a Kaizen mindset and continue to evolve regardless of what question originally got them there. Unfortunately, I have seen too many teams move to Scrum, settle in, and fight against later suggestions of Kanban, DevOps, and other emerging practices and processes. The way I see it, any status quo is a bad status quo and should, therefore, always be challenged. What do you think?

Tuesday, November 19, 2013

When NOT to Use Agile

When HealthCare.gov first rolled out, everyone experienced how terribly it was built. Many Agile enthusiasts cried out, “If only they had used Agile…!” We have since learned that HealthCare.gov used Scrum. It’s uncertain how superficial their adoption was. Michael Daconta has already done a great job describing their poor use of Agile methods in the GCN blog, and NPR has published findings from the McKinsley & Co. consultants who were brought on in March to do a progress report.

My focus here is not about the degree to which Agile was or was not properly used for HealthCare.gov. My focus is to debate under what circumstances, if any, Agile will not work. When would you NOT use Agile?
My assumptions for this debate are as follows:
  1. Agile is any processes, practices, tools, and frameworks that comply with the Agile Manifesto and its 12 Principles.
  2. In the spirit of healthy debate, I assume the audience to be open to the possibility of new and different ways of doing things. This applies particularly to both Agile skeptics and to those entrenched in a specific Agile approach.
  3. The ideas in this discussion are not etched in stone. I encourage you to share your own ideas so we can learn and grow together.

Possible Agile Risks

I was recently invited to an introductory Agile presentation. The audience was Project Managers with varying Agile knowledge and experience. It facilitated a conversation for answering questions and resolving concerns around Agile adoption. About halfway through, there was a slide that had five “Possible Agile Risks”:
  1. Business or management commitment
    • Agile requires an increased level of commitment from the business and IT management to be successful
  2. Remote or distributed teams
    • Agile benefits from close collaboration on a consistent basis. Distributed teams pose a challenge in the effort to do this effectively
  3. Remote product owners
    • The business must be consistently involved, so a remote product owner may be challenging to engage
  4. Balance delivering new features with high-quality, sustainable code
    • Agile delivers new features frequently, but this should never come at the expense of creating low quality code
  5. Team not provided adequate guidance as they implement Agile
    • Anything new will take time to get good at, it is important to supply the team with training and guidance so they can improve quickly

This disclaimer followed these risks: “These risks do not preclude teams from applying Agile; they just need to be addressed in the scenarios they are present.”

Before we get to my reaction, let’s walk through these risks. Let’s identify why they’re risky in an Agile environment.

Business or Management Commitment

A deep understanding of the business is essential to the success of the software that supports it. In Agile methodologies, this means a dedicated person who has a deep understanding of the customer’s needs, often called a “Product Owner”. Traditionally, this person is seen as “from the business side”. However, getting someone from the “business side” isn’t always possible and is, arguably, unnecessary.

In my area we have Business Analysts who understand the business needs. They are bilingual in business and IT speech. Our developers and testers have a deep business understanding of the business because they’ve been supporting it for a long time. Some Agile practitioners feel the Product Owner role is unnecessary; they believe the team should understand the customers’ needs better than anyone. The team can, therefore, manage the work themselves.

In Agile, management is not a clearly defined position. Managers may feel their job is threatened by a “self-managing” team. A manager must have the team’s best interests at heart. They must become Lean-Thinking Servant Leaders, not Command-and-Control Managers. This is a cultural shift from Waterfall. Agile teams without Servant Leader management will plateau until they are allowed to “self manage”. However, that doesn’t mean they can’t find some measure of success.

Remote or Distributed Teams

This is one of the first and most frequent challenges brought up when introducing Agile. A team is distributed when its members are not capable of frequent face-to-face conversation. Lack of co-location for an Agile team is a challenge, no question. However, modern tools such as IM-enabled ad-hoc video conferencing, digital code review tools, etc. make long-distance coordination much simpler. It may be hard to work out timing with time-zone differences, but it’s possible to have a time overlap for some real-time collaboration. This may result in having a tech lead that takes the brunt of the development’s complexity to reduce the need for collaboration among the other team members, though this will limit the team’s overall productivity.

Remote Product Owners

For this I say, “See my previous 2 sections.” However, perhaps there are situations where the team is new to the product? Perhaps the SMEs are remote? Even worse, what if those remote SMEs do not dedicate time to work with the development team? Wait, what on earth are you thinking? Seriously, this is a bad idea, regardless of methodology. You are stacking the deck against yourself and setting the team up to fail.

Balance New Features with Quality Code

One of the 12 Agile Principles states, “Continuous attention to technical excellence and good design enhances agility.” Delivering new features at the expense of quality is the technical equivalent of being “penny wise, pound foolish”. This may be faster short-term, but the long-term consequences are a slow-down of delivery. Without addressing the quality of the application, it will eventually be cheaper to replace the application than to fix it. This isn’t unique to Agile. This brings me to my initial reaction to ‘Possible Agile Risks’.

My reaction to "Possible Agile Risks"

When I first saw this list, my reaction was that the first four are not “Possible Agile Risks”. Instead, they are “Possible Software Development Risks”! The four risks of commitment, distributed teams, remote product owners, and quality are often associated with Agile development because Agile brings risks to light early. Agile makes it much more painful to ignore risks than to address them. They are not less risky with non-Agile approaches. In fact, the realization of these risks is more likely in a non-Agile approach. In Waterfall projects, risks manifest so late in the process that they are painful and expensive to fix. The first four are risks to all projects; but not necessarily the fifth and final risk on the list.

Agile Training and Guidance

Without proper training and guidance, it is difficult for those unfamiliar with the Agile paradigm to be successful with an Agile approach. Most people new to Software Development find the Agile way of thinking to be a more intuitive and human-centered. In those cases, there is less risk because less training is needed.

Those entrenched with Waterfall approaches will find it difficult to switch gears. This is the only risk I could concede as being a “Potential Agile Risk”.

Where’s the Risk?

So there are my thoughts on five risks commonly thought to make Agile less successful. I have yet to find a risk that is made any less risky by Waterfall. Does that mean Agile’s guaranteed to succeed? Absolutely not. In fact, Agile will push you to your limits. Then, right as you’re starting to feel comfortable, it pushes you some more. However, Agile will consequently turn your team into the best team they can be. Agile will expose risks and inefficiencies sooner. It will also make them more painful. As long as you don’t ignore the pain, taking care of those risks and inefficiencies will be less expensive because they are dealt with early.

But hey, maybe I’m wrong. What risks have you heard associated with Agile? What situations are wholly inappropriate for the basic tenants of the Agile Manifesto?

Monday, November 4, 2013

The Best Lesson I Learned the Hard Way

Let me preface this by saying I do not recommend learning lessons the hard way. There's a wealth of human experience out there to learn from before you go off and make the same bone-headed mistakes. However, bone-headed mistakes will be made regardless of how cautious you are. In those cases, please go into it with a Fail-Fast, Kaizen mindset so that the mistake becomes a short-lived learning experience.

The Almighty PM
I've made a lot of mistakes in life, which means I've learned a lot of lessons “the hard way”. The one such lesson that has had the most impact on my current work life took place my senior year of college. I was in a capstone class where we were to organize ourselves into a real software team to develop a real-life application on top of a new API that we had Beta access to. We were given a little guidance, including how previous classes and many companies organize themselves, but told we could do whatever we wanted. We ended up with a very “traditional” model of a few Dev teams, a few Testing teams, an Architect, and the one Project Manager to rule them all.

I was eager to prove myself, so I went for the PM position (oddly enough, I didn't really have any competition from my obviously more self-aware classmates). The problem is Computer Science majors in their fourth (okay sixth) year of study haven't usually had any PM classes or experience. My architect laid out the architecture, lots of open source Java, wikis, subversion, etc, and the class was excited to get started. However, I was concerned about how to manage the work, as well as expectations. I started demanding individual Gantt charts up-front for the duration of the semester. I was asking each team lead to compile the Gantt for their team and report that to me so I could put it all together.

The Blind Leading the Competent
Basically, I was trying to command-and-control manage a team of part-time team members, all of whom were taking at least 12 hours that semester and had limited time to spend on this class. Of that limited time, I was asking an unreasonable amount of time on administrative work. My architect was an excellent “Yes Man”, which made it difficult for me to see what I was doing wrong. The tipping point came when we weren't getting the information we were asking for from the teams and we were way behind where we expected to be on the application. Our professor was pulled away for a class and gave me the option of keeping the class time or giving everyone the day off. My architect decided, with my blessing, to use that time to express our mutual disappointment with the team and shame them into getting their act together.

I knew it was all over when the architect started his oratory with something to the effect of “By the time I finish talking you should all be mad at me, and that's okay because I'm mad at you.” It was a horrible hour and ended with our organization in shambles. I was a broken, broken man who was certain I was going to fail the class.

A Lesson in Servant Leadership
Then one of the testing team leads asked if he could meet with me to talk through things. He kindly and patiently explained why what we did was so stupid and counter-productive. He told me that the teams needed a cheerleader, not a dictator. He asked me to spend time with the individuals on the teams. He wanted me to spend more time in face-to-face conversations instead of mass emails. He wanted me to understand how hard the class was working to accomplish a common goal so that I would stop wasting their time with unnecessary busy work. He wanted me to focus on listening and removing roadblocks. He is now, unsurprisingly, a manager at Amazon, and someone I still hold in high regard.

I didn't fail the class because the objective of the class wasn't to develop a fixed scope within fixed time and budget. My wise professor wanted us to experience real-world project work as best we could in an academic setting and learn from it. He saw me try to turn things around at the end and knew that I had seen the error of my ways. He knew that I had learned my lesson, albeit the hard way.

Lesson Learned
So what lesson did I learn? To be honest, I initially thought that the lesson I was supposed to learn was that I suck at Project Management. I could not be trusted with leading a project to completion. I could code well and kinda sorta test, but the realm of Project Management was beyond my grasp.

This lesson was reinforced when I entered the workforce a few months later and saw command-and-control PMs leading projects “correctly”. These were professionals who did not go on rants against their developers and testers. They were not perfect, but they did their best to make things work in alignment with the command-and-control, iron triangle, Waterfall-driven style they were trained to use. Despite their best efforts, I found myself in War Rooms quite frequently, and my wife learned to not expect to see me in the months surrounding a Production install. I didn't realize it at the time, but I was living through the hell that I had just put my classmates through.

Of course, that wasn't the PM's fault. As I said, they were doing the best they could, and we were doing the best we could. The problems were much deeper than any one individual. We had to change the way we work, starting by not only recognizing but emphasizing the human element of software development.

The real lesson is that command-and-control Project Management doesn't work. Had I taken the time to understand Lean/Agile development processes and practices, I could have done a decent job as a Scrum Master or Agile Servant Leader in my capstone class. I might have even done some coding and testing alongside my cross-functional Agile development team(s). Even before I learned that lesson, I learned the importance of being a cheerleader. I have always striven to let the teams I've worked with know what a great job they're doing and how much I appreciate them. I haven't always succeeded, but that pep talk I received my final year of college never left me.

Once I realized that what I was experiencing in corporate life was essentially the same as that capstone class, I vowed to change things. I delved into the world of Lean and Agile and brought the things I learned back to my area. To many people it looks like I've picked it up extremely quickly; in reality, I've been learning this lesson for at least six years. If anything, I'm ashamed it took this long to finally “click”.

Tuesday, August 13, 2013

Taming the Wild West: the Differences between Agile and Cowboy Coding

One of the strongest arguments for Agile is that it’s not Waterfall. However, not everything that isn't Waterfall is Agile, a fact that’s not always understood. This misunderstanding hurts the Agile brand when people familiar with only Waterfall begin associating all other methodologies, including a lack thereof, as Agile. I want to be very clear about this: Agile is not Cowboy Coding, and Cowboy Coding is not unique to Agile teams. It is important both to understand how Agile and Cowboy Coding are different and what Cowboy Coding looks like so that you can identify it on your teams (yes, even Waterfall teams).

The Loner

One of the easiest signs of a Cowboy Coder is that he’s a loner. He may be working under the name of Agile, but there are no Agile methodologies or frameworks I’m aware of that support such behavior. In fact, the backing principles of the Agile Manifesto state, “Business people and developers must work together daily throughout the project”; “Build projects around motivated individuals”; “The most efficient and effective method of conveying information to and within a development team is face-to-face conversation”; “The best architectures, requirements, and designs emerge from self-organizing teams”; and “At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly.” The manifesto, its principles, and all Agile methodologies and frameworks I know of are very human-centered with an emphasis on collaboration.

If you have a loner on your team that insists on working in a silo, there’s a possibility that you have a cowboy in your midst. Try to rein them in using mandatory meeting/ceremonies that promote meaningful conversations and practices like Pair Programming. If they absolutely refuse then you will likely end up spending considerable time managing the work around them – holding ad hoc conversations, formal code reviews, knowledge transfer workshops, etc. – with diminishing returns.

Straight to Production

Working directly with Production code or with a source code repository that isn't versioned is a bad idea. Don’t get me wrong, I love Continuous Delivery and working off the trunk, but a software development team must be very mature and disciplined to make this work. They use feature toggles and branching by abstraction to protect code that isn’t ready for Production. They build test suites around the code so that each commit is verified against regression. They do their due diligence to make sure that a change isn't going to blow up if it’s pushed to Production. Cowboys, simply put, don’t.

If you find yourself consistently in a situation where the same person or people are making changes directly to Production without due diligence then you might just be working with Cowboys. Have them read up on DevOps and Continuous Delivery so they can learn the right way to get changes to Production quickly. Emergency situations that require quick, non-vetted changes to Production should be avoided at all costs.

Wastes of Time


The Cowboy will often refer to Testing and Documentation as a waste of time. They may even commit the cardinal sin of Agile, reciting the Manifesto blasphemously: “‘Working software is the primary measure of progress’; anything else is just a waste of time!” To those people, I would ask them to define “working”. Does it pass the Acceptance Criteria associated to the work (or did you even bother to ensure you had Acceptance Criteria)? Can anybody actually use it, or is it too buggy or complex? Is anyone other than yourself aware of the assumptions made around input, output, workflow, etc.?

Without proper testing and documentation, you can’t prove your software works nor can anybody understand how it works. With that being said, if your tests and documentation don’t contribute to the value and usability of the software then they are, in fact, a waste of time. Focus your testing efforts on tests that actually stand a chance of failing and finding vulnerabilities. Don’t spin your wheels creating “write-only” documentation. This is the approach that Agile espouses; anyone who says tests and documentation are altogether useless is operating with a Cowboy mindset, not an Agile one.

“Emergent Architecture”

One of the backing principles to the Agile Manifesto states “The best architectures, requirements, and designs emerge from self-organizing teams”. There are those who believe this means “just make it up as you go.” That’s not entirely accurate. There still needs to be intelligent design, and that design needs to make the software as easy to comprehend and maintain as possible. As another principle clarifies, “Continuous attention to technical excellence and good design enhances agility.” This means having a thorough understanding of the latest design patterns and practices. It means taking the time to refactor working code into something better. It means taking a little bit of time up-front to design what you think will work and adjusting as you go.

Agile developers do not shoot from the hip. They take pride in their applications; they have a sense of ownership. They will throw research spikes, read books, build proofs-of-concept, attend conferences – do what it takes to build the right thing in the right way. You’ll spot a Cowboy by their purposeful lack of direction, sticking code wherever they please with the sole purpose of “getting something to work” so they can move on to the next thing. If they do it in the name of “emergent architecture” then call shenanigans. That’s not architecture, it’s just reckless.

Somewhere to Hang their Hat

The good news is that cowboys can be tamed if they can come to appreciate the practices, tools, and frameworks that Agile provides. Cowboys won’t jump on the bandwagon just for the heck of it. There will always be some that refuse to be tamed, but many will see the benefits and forsake their wandering ways once you give them a safe place to hang their hat.

One of the great things about reformed Cowboys is they are used to developing quickly and cross-functionally. If you arm them with XP practices, Agile tools, a Kaizen mindset, and continued training and development, they can become model developers that contribute quality software time after time.

Just don’t make the mistake of trying to get them to do something for which there is no tangible benefit. They don’t take too kindly to that.